Critical Notices

TSP: 30020

TSP Name: HIGH ISLAND OFFSHORE SYSTEM LLC

Notice Identifier
3112
Critical Notice Description (Critical Desc):
Critical notice
TSP Name:
HIGH ISLAND OFFSHORE SYSTEM LLC
Notice Effective Date/Time:
Notice End Date/Time:
Prior Notice:
Notice Stat Desc:
Initiate
Notice Type:
MAINT
Subject:
HIOS PLATFORM PIPELINE REPAIR - WC167
Required Response Indicator Description:
NO RESPONSE REQUIRED
Response Date/Time:
Posting Date/Time:
10/25/2022 2:55:55 PM
Notice Text
HIOS PLATFORM PIPELINE REPAIR WC167 HIOS has identified maintenance items on WC 167 that require immediate attention. In order to perform the maintenance, the flow across the facility will need to be shut in and the topside piping depressurized. As such, plans are to shut in all deliveries to Kinetica at WC 167 in early November. The tentative date to begin the maintenance is November 4, 2022, and could possibly take 5 to 7 days to complete. During this time, all production that is normally scheduled to be delivered to Kinetica at WC 167 will have to be shut in. Only receipt volumes scheduled for delivery to a buyback meter will be allowed to flow. Any producers that need to do maintenance work that requires shutting in their production for up to 5 to 7 days are encouraged to do so during this WC 167 shut in period. Further information will be posted as it becomes available.